Oil & Gas & EPC Contractor

Project Management
WO · SD · Material · Spool

An integrated platform from project planning and engineering document control to material receiving (MRR) and per-item spool fabrication tracking — with full traceability and role-based access.

7
Active Projects
25
Active Spools
6
MRR In Process
21
WO In Progress

About the System

One platform for document control, material receiving, and the oil & gas contractor spool fabrication pipeline

Work Order

Work scope, assignee, priority, and field progress per discipline.

Shop Drawing

Per-item engineering documents with controlled numbers and staged revisions.

Material (MRR)

Material receiving records, PMI/MTR inspection, and QC approval.

Spool & Fabrication

Per-spool pipeline: receiving → joint fabrication → NDT → installation.

Review & QC

Reviewers check SDs, MRR material, and fabrication inspection results.

Reports & Monitoring

Dashboard, deadline calendar, PDF/Excel performance reports, and audit trail.

Integrated Workflow

Process order follows the system menu — from projects through document transmittal

Projects
Project Manager
Work Order
Project Manager
Shop Drawing
Engineer
BOM / MTO
Engineer
PR & Sourcing
Engineer / PM
RFQ / Quotation
Doc Controller
Purchase Order
PM / Doc Controller
Delivery
Vendor / Site
Material (MRR)
Site Supervisor
Inventory / Stock
Doc Controller
Invoice & AP
PM / Director
Spool & Fabrication
Engineer / QC
HSE & Commissioning
HSE / QC
Transmittal
Document Controller
Document Control (SD)

Engineer creates SD → Document Controller submits → Reviewer reviews & approves → as-built

Revision Required Engineer fixes & resubmits
Procurement → Inventory → Fabrication

PR approved → PO to vendor → MRR at site → approved material enters inventory → issued to spool → fabrication → NDT → installation

Process Stages

1
Projects

PM sets scope, team, and project schedule

2
Work Order

WO issued per work scope & discipline

3
Shop Drawing

Engineer prepares isometric / weld map per item

4
BOM / MTO

Material Take-Off from spool/WO → generate PR

5
Purchase Requisition

Engineer/Supervisor requests material needs

6
RFQ & Quotation

Request vendor quotes, compare & select winner

7
Purchase Order

PM/Doc Controller issues PO to selected vendor

8
Delivery & MRR

Vendor ships (delivery note) → Site Supervisor records receipt

9
Inventory / Stock

Approved material enters stock, then issued to spool/WO

10
Budget & Invoice

Cost control: PO commitment vs budget, then invoice & payment

11
Spool & Fabrication

Per-spool tracking: joint fabrication through installation

12
HSE & Commissioning

HSE reports, punch list & system commissioning

13
Transmittal

Document Controller issues SD to client/owner

14
Reports

PM reviews WO, SD, PR/PO, MRR, and spool pipeline performance

Roles & Responsibilities

10 operational roles across project control, engineering & document control, procurement & finance, and material, warehouse & fabrication

Project Planning & Control
Project Director Project Manager
Engineering & Document Control
Engineer Document Controller Reviewer
Procurement & Finance
Procurement Officer Finance Officer
Material, Warehouse & Fabrication
Warehouse / Logistics Site Supervisor Reviewer (QC) Engineer
Stakeholder (Read-Only)
Viewer
Project Director

Owns strategic project direction and top-level decisions.

  • Cross-project oversight and team performance review
  • Final approval for critical MRR and spool material
  • Review & approve strategic Shop Drawings
Project Manager

Owns day-to-day project operations and team coordination.

  • Issue WOs and monitor the spool fabrication pipeline
  • Approve PRs and issue POs to vendors
  • Coordinate MRR inspection and spool material approval
  • Assign work and monitor progress & overdue items
Document Controller

Controls document numbers, MRR, and the transmittal cycle.

  • Register MRR and spool numbers per isometric
  • Create POs from approved PRs & manage vendors
  • Control SD revisions and submit engineering documents
  • Keep document and material status consistent
Procurement Officer

Runs procurement: vendor sourcing through PO issuance.

  • Manage RFQs, receive & compare vendor quotations
  • Create POs from PR/Quotation and manage vendor & catalog data
  • Track Delivery Notes and process Vendor Returns
Finance Officer

Finance staff: invoice/AP entry and project budget control.

  • Enter Invoice / Accounts Payable from POs
  • Manage budget lines & monitor cost consumption
  • Approval & payment stay with Manager/Director (segregation of duties)
Engineer

Produces engineering documents and executes fabrication work.

  • Register spools per isometric / weld map item
  • Update spool fabrication & installation stages at shop/site
  • Create SDs, submit revisions, and report WO progress
Reviewer

QC / technical reviewer for documents, material, and spool NDT.

  • Inspect & approve MRR (PMI, MTR, dimensions)
  • Inspect spool material and fabrication NDT results
  • Review SD: approve, reject, or request revision
Site Supervisor

Supervises material receiving and field execution.

  • Record Material Receiving (MRR) at the material yard
  • Update spool stages: receiving, fabrication, installation
  • Update WO progress and report issues to the PM
Warehouse / Logistics

Warehouse/logistics: material receiving and issuing.

  • Record Delivery & MRR receipts at warehouse/yard
  • Manage inventory stock: receive, issue, and adjust
  • Keep location & quantity accurate per project
Viewer

Read-only access for stakeholders who need visibility.

  • View allowed MRR, spool, WO, and SD status
  • Download documents per project access rights
  • No data changes (read-only)

Work Disciplines

Supports all engineering disciplines for oil & gas contractors

Piping
Mechanical
Electrical
Instrument
Civil
Structural
HSE

Featured Projects

Active projects with WO, SD, MRR, and spool summaries

PRJ-011
Subsea Pipeline Tie-in K

PT Laut Dalam

Makassar Strait

0%
0% WO completed
3 WO 5 SD 2 MRR 5 Spool
PRJ-006
Tank Farm Expansion F

PT Kilang Pertama

Cilacap

0%
0% WO completed
4 WO 6 SD 0 MRR 0 Spool
PRJ-005
Offshore Topside Modification E

PT Samudra Energi

Natuna

0%
0% WO completed
4 WO 6 SD 0 MRR 0 Spool
PRJ-004
Pipeline Pigging Station D

PT Gas Mandiri

Sumatera Selatan

25%
25% WO completed
4 WO 5 SD 2 MRR 4 Spool
PRJ-003
Upgrade Fasilitas Produksi C

PT Andalan Energi

Riau

75%
75% WO completed
4 WO 5 SD 0 MRR 0 Spool
PRJ-002
Modular Skid Package B

PT Migas Sejahtera

Bontang

0%
0% WO completed
4 WO 7 SD 3 MRR 6 Spool

Platform Strengths

  • Integrated flow: Project → WO → SD → MRR → Spool → Transmittal
  • Per-item spool fabrication pipeline with QC inspection gates
  • Material Receiving Report (MRR) with approval history
  • SD document control with Rev A, B, C... traceability
  • Role-based access for 10 operational roles aligned to field duties
  • Project performance reports exportable to PDF & Excel, plus audit trail

Ready to Manage Your Projects?

Sign in to manage WOs, Shop Drawings, Material (MRR), and the spool fabrication pipeline.

Staff Login